Backend APIs are 100% ready for Sprint 4 frontend implementation. Created comprehensive verification report and optional enhancement story for advanced UX fields.
Changes:
- Created backend_api_verification.md (detailed API analysis)
- Created Story 0: Backend API Enhancements (optional P2)
- Created 6 tasks for Story 0 implementation
- Updated Sprint 4 to include backend verification status
- Verified Story/Task CRUD APIs are complete
- Documented missing optional fields (AcceptanceCriteria, Tags, StoryPoints, Order)
- Provided workarounds for Sprint 4 MVP
Backend Status:
- Story API: 100% complete (8 endpoints)
- Task API: 100% complete (9 endpoints)
- Security: Multi-tenant isolation verified
- Missing optional fields: Can be deferred to future sprint
Frontend can proceed with P0/P1 Stories without blockers.
🤖 Generated with [Claude Code](https://claude.com/claude-code)
Co-Authored-By: Claude <noreply@anthropic.com>