# ColaFlow Sprint Plan **Version:** 1.0 **Date:** 2025-11-02 **Planning Period:** 48 weeks (12 months) **Sprint Duration:** 2 weeks **Total Sprints:** 24 --- ## Sprint Planning Methodology ### Sprint Structure - **Duration:** 2 weeks (10 working days) - **Capacity:** Based on team velocity and availability - **Ceremonies:** - Sprint Planning (Day 1): 2-4 hours - Daily Standup: 15 minutes daily - Sprint Review (Last day): 1-2 hours - Sprint Retrospective (Last day): 1 hour ### Team Velocity Assumptions - **Initial Velocity:** 20-25 story points per sprint (to be calibrated) - **Expected Growth:** 10-15% improvement by M3 - **Stabilized Velocity:** 30-35 points by M6 ### Definition of Done (DoD) - Code is written and reviewed - Unit tests written and passing (>80% coverage) - Integration tests passing - Documentation updated - Acceptance criteria met - QA tested and approved - Deployed to staging environment --- ## M1: Core Project Management Module (Sprints 1-4) ### Sprint 1: Project Foundation **Duration:** Weeks 1-2 **Team:** 2 Backend, 1 Frontend, 1 QA, 1 Architect (part-time) **Velocity Target:** 20 points **Sprint Goal:** Establish project structure and basic CRUD for projects #### Stories 1. **Story 1.1.1: Create Project Entity Model** (5 points) - T1.1.1.1-7: Database schema, API, tests - **Owner:** Backend Team - **Dependencies:** None 2. **Story 1.1.2: Create Epic/Story/Task Hierarchy** (8 points) - T1.1.2.1-5: Schema design, hierarchy validation - **Owner:** Backend Team - **Dependencies:** Story 1.1.1 3. **Setup: Development Environment** (3 points) - Repository setup - CI/CD pipeline - Docker configuration - **Owner:** Backend Team 4. **Setup: Frontend Boilerplate** (4 points) - React + TypeScript setup - Component library integration - Routing and state management - **Owner:** Frontend Team #### Deliverables - ✅ Project CRUD API functional - ✅ Basic hierarchy model implemented - ✅ Development environment ready - ✅ Frontend framework configured #### Risks - Team onboarding delays - Technology stack learning curve - Infrastructure setup complexity --- ### Sprint 2: Hierarchy & Workflows **Duration:** Weeks 3-4 **Velocity Target:** 22 points **Sprint Goal:** Complete issue hierarchy and implement workflow system #### Stories 1. **Story 1.1.2: Create Epic/Story/Task Hierarchy (continued)** (5 points) - T1.1.2.6-8: Move functionality, tests, indexing - **Owner:** Backend Team 2. **Story 1.1.3: Custom Fields Support** (5 points) - T1.1.3.1-7: Custom field schema and validation - **Owner:** Backend Team 3. **Story 1.2.1: Default Workflow Implementation** (6 points) - T1.2.1.1-6: Workflow engine, status transitions - **Owner:** Backend Team 4. **Frontend: Project List & Create Form** (6 points) - Project listing page - Create project modal - Form validation - **Owner:** Frontend Team #### Deliverables - ✅ Complete hierarchy with 4 levels (Epic/Story/Task/Sub-task) - ✅ Custom fields functional - ✅ Default workflow operational - ✅ Project management UI #### Risks - Hierarchy validation complexity - Custom field performance concerns --- ### Sprint 3: Custom Workflows & Kanban Foundation **Duration:** Weeks 5-6 **Velocity Target:** 24 points **Sprint Goal:** Enable workflow customization and begin Kanban UI #### Stories 1. **Story 1.2.2: Custom Workflow Configuration** (8 points) - T1.2.2.1-7: Workflow builder, migration logic - **Owner:** Backend Team 2. **Story 1.3.1: Basic Kanban Board Display** (8 points) - T1.3.1.1-8: Board components, filtering, search - **Owner:** Frontend Team 3. **Story 1.4.1: Comprehensive Change Tracking (start)** (5 points) - T1.4.1.1-4: Audit log schema and basic logging - **Owner:** Backend Team 4. **Testing: Integration Test Suite** (3 points) - Setup integration test framework - Core API endpoint tests - **Owner:** QA #### Deliverables - ✅ Workflow customization UI and backend - ✅ Kanban board displays issues - ✅ Audit logging captures changes - ✅ Integration tests running in CI/CD #### Risks - Workflow migration complexity - Kanban performance with many issues --- ### Sprint 4: Kanban Interactions & Audit Complete **Duration:** Weeks 7-8 **Velocity Target:** 25 points **Sprint Goal:** Complete Kanban drag-and-drop and audit/rollback features #### Stories 1. **Story 1.3.2: Drag-and-Drop Functionality** (8 points) - T1.3.2.1-8: react-beautiful-dnd integration, mobile support - **Owner:** Frontend Team 2. **Story 1.4.1: Comprehensive Change Tracking (complete)** (5 points) - T1.4.1.5-8: Query API, filters, retention policies - **Owner:** Backend Team 3. **Story 1.4.2: Rollback Capability** (8 points) - T1.4.2.1-8: Rollback service, UI, conflict detection - **Owner:** Backend + Frontend Teams 4. **Testing: M1 QA & Bug Fixes** (4 points) - Full regression testing - Performance testing - Bug fixes - **Owner:** QA + All Teams #### Deliverables - ✅ Fully functional Kanban with drag-and-drop - ✅ Complete audit trail with rollback - ✅ M1 features tested and stable - ✅ M1 milestone complete #### M1 Retrospective - Review velocity and adjust for M2 - Identify process improvements - Celebrate M1 completion --- ## M2: MCP Server Implementation (Sprints 5-8) ### Sprint 5: MCP Foundation & Authentication **Duration:** Weeks 9-10 **Team:** 2 Backend, 1 Frontend, 1 AI Engineer, 1 QA **Velocity Target:** 25 points **Sprint Goal:** Setup MCP server infrastructure with security #### Stories 1. **Story 2.1.1: MCP Server Setup & Configuration** (6 points) - T2.1.1.1-8: MCP SDK integration, connection handling - **Owner:** Backend Team 2. **Story 2.1.2: Authentication & Authorization for MCP** (8 points) - T2.1.2.1-8: Token management, rate limiting, admin UI - **Owner:** Backend + Frontend Teams 3. **Story 2.2.1: Implement projects.search Resource** (5 points) - T2.2.1.1-7: Resource provider, permissions - **Owner:** Backend Team 4. **AI Engineer Onboarding** (3 points) - MCP protocol training - Codebase familiarization - AI integration planning - **Owner:** Architect + AI Engineer 5. **Documentation: MCP Architecture** (3 points) - Architecture diagrams - Security model documentation - **Owner:** Architect #### Deliverables - ✅ MCP server running and connectable - ✅ Token-based authentication working - ✅ First MCP resource functional - ✅ AI engineer onboarded #### Risks - MCP SDK learning curve - Security implementation complexity --- ### Sprint 6: MCP Resources Complete **Duration:** Weeks 11-12 **Velocity Target:** 26 points **Sprint Goal:** Expose all read-only MCP resources #### Stories 1. **Story 2.2.2: Implement issues.search Resource** (8 points) - T2.2.2.1-8: Complex query parser, pagination, related entities - **Owner:** Backend Team 2. **Story 2.2.3: Implement Additional Resources** (10 points) - T2.2.3.1-7: docs, reports, sprints, backlogs resources - **Owner:** Backend Team 3. **Testing: MCP Resource Integration Tests** (5 points) - Test all resources via MCP client - Performance testing for resources - **Owner:** QA + AI Engineer 4. **Frontend: Token Management UI** (3 points) - Token list view - Create/revoke token functionality - **Owner:** Frontend Team #### Deliverables - ✅ All planned MCP resources implemented - ✅ Resources tested and documented - ✅ Token management UI complete - ✅ MCP catalog published #### Risks - Complex query parsing for issues.search - Performance optimization needs --- ### Sprint 7: Diff Preview System & First Tools **Duration:** Weeks 13-14 **Velocity Target:** 28 points **Sprint Goal:** Implement diff preview mechanism and first MCP tools #### Stories 1. **Story 2.3.1: Implement Diff Preview System** (10 points) - T2.3.1.1-8: Diff generation, storage, approval flow - **Owner:** Backend Team 2. **Story 2.3.2: Implement create_issue Tool** (6 points) - T2.3.2.1-8: Tool provider, validation, diff integration - **Owner:** Backend Team 3. **Story 2.3.3: Implement update_status Tool** (5 points) - T2.3.3.1-8: Status change tool with workflow validation - **Owner:** Backend Team 4. **Story 2.4.1: Diff Review Interface (start)** (7 points) - T2.4.1.1-5: List view, detail view, comparison UI - **Owner:** Frontend Team #### Deliverables - ✅ Diff preview system operational - ✅ First two MCP tools functional - ✅ Diff review UI in progress - ✅ Write operations require approval #### Risks - Diff algorithm complexity - UI/UX for diff review --- ### Sprint 8: Complete AI Control Console **Duration:** Weeks 15-16 **Velocity Target:** 29 points **Sprint Goal:** Finish all MCP tools and AI control console #### Stories 1. **Story 2.3.4: Implement Additional Tools** (8 points) - T2.3.4.1-7: assign_task, log_decision, generate_report, estimate_task - **Owner:** Backend Team 2. **Story 2.4.1: Diff Review Interface (complete)** (6 points) - T2.4.1.6-8: Batch operations, real-time updates, tests - **Owner:** Frontend Team 3. **Story 2.4.2: AI Activity Dashboard** (8 points) - T2.4.2.1-7: Analytics API, charts, metrics - **Owner:** Backend + Frontend Teams 4. **Testing: M2 End-to-End Tests** (5 points) - Full MCP flow testing - Security testing - Bug fixes - **Owner:** QA + All Teams 5. **Documentation: MCP Integration Guide** (2 points) - How to connect AI tools - Example workflows - **Owner:** AI Engineer #### Deliverables - ✅ All MCP tools implemented - ✅ AI control console complete - ✅ M2 features tested and stable - ✅ M2 milestone complete #### M2 Retrospective - Evaluate MCP implementation - Adjust velocity for M3 - Plan ChatGPT integration approach --- ## M3: ChatGPT Integration PoC (Sprints 9-12) ### Sprint 9: AI Task Generation Foundation **Duration:** Weeks 17-18 **Team:** 1 Backend, 1 Frontend, 1 AI Engineer, 1 QA **Velocity Target:** 28 points **Sprint Goal:** Implement AI-powered task generation #### Stories 1. **Story 3.1.1: Natural Language Task Creation** (10 points) - T3.1.1.1-8: OpenAI integration, prompt templates, task generation UI - **Owner:** AI Engineer + Backend + Frontend Teams 2. **Story 3.1.2: Automatic Acceptance Criteria Generation** (8 points) - T3.1.2.1-8: AC generation service, feedback mechanism - **Owner:** AI Engineer + Backend Teams 3. **Prompt Engineering: Template Library** (5 points) - Design prompt templates - Test and refine prompts - Documentation - **Owner:** AI Engineer 4. **Testing: AI Generation Quality** (5 points) - Test generation accuracy - Edge case handling - **Owner:** QA + AI Engineer #### Deliverables - ✅ Task generation from natural language - ✅ AC generation working - ✅ Prompt templates documented - ✅ Quality metrics established #### Risks - AI output quality variability - Prompt engineering complexity - OpenAI API costs --- ### Sprint 10: Automated Reporting **Duration:** Weeks 19-20 **Velocity Target:** 29 points **Sprint Goal:** Build AI-generated reports and summaries #### Stories 1. **Story 3.2.1: Daily Standup Report Generation** (10 points) - T3.2.1.1-8: Report aggregation, scheduling, Slack/email delivery - **Owner:** Backend + AI Engineer Teams 2. **Story 3.2.2: AI-Generated Risk Reports** (10 points) - T3.2.2.1-8: Risk analysis, alerting, dashboard - **Owner:** Backend + Frontend + AI Engineer Teams 3. **Frontend: Report Templates UI** (5 points) - Report viewer - Template customization - **Owner:** Frontend Team 4. **Integration: Slack Preparation** (4 points) - Slack app registration - Initial integration setup - **Owner:** Backend Team #### Deliverables - ✅ Automated daily reports - ✅ Risk detection and reporting - ✅ Report UI complete - ✅ Slack integration ready for M4 #### Risks - Report quality and accuracy - False positive risk alerts --- ### Sprint 11: ChatGPT Custom GPT Setup **Duration:** Weeks 21-22 **Velocity Target:** 30 points **Sprint Goal:** Create and configure ColaFlow GPT #### Stories 1. **Story 3.3.1: ColaFlow GPT Configuration** (10 points) - T3.3.1.1-8: GPT creation, MCP connection, testing, documentation - **Owner:** AI Engineer 2. **Story 3.3.2: Conversational Project Management** (12 points) - T3.3.2.1-8: Conversation flows, context management, testing - **Owner:** AI Engineer 3. **Testing: GPT User Acceptance** (5 points) - Internal user testing - Conversation quality evaluation - Feedback collection - **Owner:** QA + All Team Members 4. **Documentation: GPT User Guide** (3 points) - Setup instructions - Example conversations - Best practices - **Owner:** AI Engineer #### Deliverables - ✅ ColaFlow GPT live and functional - ✅ Conversational interface working - ✅ User documentation complete - ✅ Internal users testing GPT #### Risks - GPT configuration limitations - Conversation quality issues - MCP connection stability --- ### Sprint 12: M3 Polish & Integration Testing **Duration:** Weeks 23-24 **Velocity Target:** 25 points **Sprint Goal:** Refine AI features and complete M3 testing #### Stories 1. **AI Feature Refinement** (8 points) - Improve prompt quality based on feedback - Optimize AI response times - Enhance error handling - **Owner:** AI Engineer 2. **Integration Testing: End-to-End Workflows** (10 points) - Test complete workflows (idea → GPT → tasks → reports) - Performance testing with AI operations - Bug fixes - **Owner:** QA + All Teams 3. **Documentation: AI Best Practices** (4 points) - Prompt engineering guide - AI operation patterns - Troubleshooting guide - **Owner:** AI Engineer 4. **Demo Preparation** (3 points) - Create demo scenarios - Prepare presentation - Record demo video - **Owner:** PM + Team #### Deliverables - ✅ AI features polished and stable - ✅ M3 fully tested - ✅ Documentation complete - ✅ M3 milestone complete - ✅ Demo ready for stakeholders #### M3 Retrospective - Evaluate AI integration success - Gather user feedback - Plan M4 external integrations --- ## M4: External System Integration (Sprints 13-16) ### Sprint 13: GitHub Integration Foundation **Duration:** Weeks 25-26 **Team:** 2 Backend, 1 Frontend, 1 QA **Velocity Target:** 30 points **Sprint Goal:** Implement GitHub OAuth and PR linking #### Stories 1. **Story 4.1.1: GitHub OAuth & Repository Connection** (8 points) - T4.1.1.1-7: OAuth flow, repository selection, configuration - **Owner:** Backend + Frontend Teams 2. **Story 4.1.2: PR → Task Linking** (10 points) - T4.1.2.1-8: Webhook handler, auto-linking, status sync - **Owner:** Backend + Frontend Teams 3. **Story 4.1.3: Branch & Commit Tracking** (8 points) - T4.1.3.1-8: Commit webhooks, timeline UI, diff viewer - **Owner:** Backend + Frontend Teams 4. **Testing: GitHub Integration** (4 points) - Test webhook reliability - Test auto-linking accuracy - **Owner:** QA #### Deliverables - ✅ GitHub repositories connected - ✅ PR-task linking functional - ✅ Commit tracking operational - ✅ Integration tested #### Risks - GitHub API rate limits - Webhook delivery reliability - GitHub Enterprise compatibility --- ### Sprint 14: Slack Integration **Duration:** Weeks 27-28 **Velocity Target:** 31 points **Sprint Goal:** Complete Slack app with notifications and commands #### Stories 1. **Story 4.2.1: Slack App & Bot Setup** (7 points) - T4.2.1.1-7: App creation, OAuth, bot configuration - **Owner:** Backend + Frontend Teams 2. **Story 4.2.2: Task Notifications in Slack** (10 points) - T4.2.2.1-7: Notification events, formatting, preferences - **Owner:** Backend + Frontend Teams 3. **Story 4.2.3: Slash Commands in Slack** (10 points) - T4.2.3.1-7: Command registration, handlers, permissions - **Owner:** Backend Team 4. **Testing: Slack Integration** (4 points) - Test all notification types - Test all commands - **Owner:** QA #### Deliverables - ✅ Slack app published - ✅ Notifications working - ✅ Slash commands functional - ✅ Integration tested #### Risks - Slack API limitations - Notification spam concerns - Command UX challenges --- ### Sprint 15: Calendar Integration & Polish **Duration:** Weeks 29-30 **Velocity Target:** 30 points **Sprint Goal:** Add calendar sync and refine all integrations #### Stories 1. **Story 4.3.1: Google Calendar Integration** (10 points) - T4.3.1.1-7: OAuth, event sync, two-way sync, configuration - **Owner:** Backend + Frontend Teams 2. **Integration Polish: GitHub** (5 points) - Bug fixes from user feedback - Performance optimization - UX improvements - **Owner:** Backend + Frontend Teams 3. **Integration Polish: Slack** (5 points) - Notification refinement - Command improvements - UX enhancements - **Owner:** Backend Team 4. **Frontend: Integration Settings Page** (6 points) - Unified integration management UI - Connection status display - Configuration options - **Owner:** Frontend Team 5. **Testing: Multi-Integration Scenarios** (4 points) - Test interactions between integrations - End-to-end workflow testing - **Owner:** QA #### Deliverables - ✅ Calendar integration complete - ✅ All integrations polished - ✅ Integration settings UI - ✅ Multi-integration tested #### Risks - Calendar sync conflicts - Integration interaction issues --- ### Sprint 16: M4 Integration Testing & Documentation **Duration:** Weeks 31-32 **Velocity Target:** 28 points **Sprint Goal:** Complete M4 testing and prepare for enterprise pilot #### Stories 1. **Integration Testing: Complete Workflows** (10 points) - Test GitHub → Slack → Calendar flows - Test AI → GitHub integration - Performance testing with integrations - Bug fixes - **Owner:** QA + All Teams 2. **Documentation: Integration Guides** (8 points) - GitHub integration setup guide - Slack integration setup guide - Calendar integration setup guide - Troubleshooting guides - **Owner:** Backend + AI Engineer Teams 3. **Security Audit: OAuth & Webhooks** (5 points) - Review OAuth implementations - Webhook security validation - Token management audit - **Owner:** Backend + Architect 4. **Demo: Integration Showcase** (5 points) - Create demo scenarios - Record integration demos - Prepare for stakeholder presentation - **Owner:** PM + Team #### Deliverables - ✅ M4 fully tested and stable - ✅ All integration docs complete - ✅ Security audit passed - ✅ M4 milestone complete - ✅ Ready for enterprise pilot #### M4 Retrospective - Evaluate integration success - Identify scalability concerns - Plan enterprise features for M5 --- ## M5: Enterprise Pilot (Sprints 17-18) ### Sprint 17: Enterprise Features Implementation **Duration:** Weeks 33-34 **Team:** 2 Backend, 1 Frontend, 1 DevOps, 1 QA, 1 PM **Velocity Target:** 32 points **Sprint Goal:** Implement SSO, advanced permissions, and compliance #### Stories 1. **Story 5.1.1: Single Sign-On (SSO) Support** (10 points) - T5.1.1.1-7: SAML & OIDC implementation, IdP configuration - **Owner:** Backend + Frontend Teams 2. **Story 5.1.2: Advanced Permission System** (10 points) - T5.1.2.1-7: Custom roles, field-level permissions, audit - **Owner:** Backend + Frontend Teams 3. **Story 5.1.3: Compliance & Data Privacy** (10 points) - T5.1.3.1-8: GDPR features, retention policies, encryption verification - **Owner:** Backend + DevOps Teams 4. **Testing: Enterprise Feature Testing** (2 points) - SSO testing with multiple IdPs - Permission testing - **Owner:** QA #### Deliverables - ✅ SSO working with major IdPs - ✅ Advanced permissions functional - ✅ GDPR compliance features complete - ✅ Enterprise features tested #### Risks - SSO implementation complexity - Permission system performance - Compliance verification --- ### Sprint 18: Performance Optimization & Pilot Deployment **Duration:** Weeks 35-36 **Velocity Target:** 30 points **Sprint Goal:** Optimize performance and deploy pilot environment #### Stories 1. **Story 5.2.1: Database Optimization** (8 points) - T5.2.1.1-7: Query optimization, indexing, monitoring - **Owner:** Backend + DevOps Teams 2. **Story 5.2.2: Caching Strategy** (7 points) - T5.2.2.1-7: Redis caching, invalidation, metrics - **Owner:** Backend Team 3. **Story 5.2.3: Horizontal Scaling** (10 points) - T5.2.3.1-8: Stateless design, Kubernetes, load balancing - **Owner:** DevOps + Backend Teams 4. **Story 5.3.1: Pilot Environment Setup** (5 points) - T5.3.1.1-8: Infrastructure provisioning, deployment, monitoring - **Owner:** DevOps Team #### Deliverables - ✅ Performance optimized (meets SLA) - ✅ Caching implemented and tuned - ✅ Horizontal scaling ready - ✅ Pilot environment deployed - ✅ Ready for user onboarding #### Risks - Performance tuning complexity - Infrastructure costs - Deployment issues --- ## M5 Pilot Period (2 weeks) ### Pilot Weeks 1-2: User Onboarding & Monitoring **Duration:** Weeks 37-38 **Activities:** User training, feedback collection, bug fixing **Team:** All hands for support #### Activities 1. **Story 5.3.2: User Onboarding & Training** - Conduct training sessions - Provide documentation - Setup support channels - **Owner:** PM + All Teams 2. **Story 5.3.3: Feedback Collection & Iteration** - Daily check-ins with users - Bug triage and hot fixes - Feature request logging - **Owner:** PM + QA + All Teams #### Key Metrics to Track - User adoption rate - Feature usage statistics - Bug report volume and severity - User satisfaction scores - Performance metrics under real load #### Deliverables - ✅ All pilot users onboarded - ✅ Daily feedback collected - ✅ Critical bugs resolved - ✅ M5 milestone complete - ✅ Feedback report for M6 planning #### M5 Retrospective - Analyze pilot success - Prioritize M6 improvements - Validate launch readiness --- ## M6: Stable Release (Sprints 19-24) ### Sprint 19: API Documentation & SDK Foundation **Duration:** Weeks 39-40 **Team:** Full team (9 people) **Velocity Target:** 35 points **Sprint Goal:** Create comprehensive API docs and begin SDK development #### Stories 1. **Story 6.1.1: API Documentation** (10 points) - T6.1.1.1-8: Swagger setup, documentation generation, examples - **Owner:** Backend + AI Engineer Teams 2. **Story 6.1.2: ColaFlow SDK (TypeScript)** (12 points) - T6.1.2.1-4: SDK architecture, TypeScript implementation - **Owner:** Backend Team 3. **Frontend: Documentation Portal** (8 points) - Build documentation website - API explorer interface - **Owner:** Frontend Team 4. **Testing: API & SDK Testing** (5 points) - API documentation accuracy - SDK functionality tests - **Owner:** QA #### Deliverables - ✅ Complete API documentation - ✅ TypeScript SDK functional - ✅ Documentation portal live - ✅ API & SDK tested #### Risks - Documentation completeness - SDK API design decisions --- ### Sprint 20: SDK Completion & Developer Portal **Duration:** Weeks 41-42 **Velocity Target:** 35 points **Sprint Goal:** Complete SDKs and launch developer portal #### Stories 1. **Story 6.1.2: ColaFlow SDK (Python)** (10 points) - T6.1.2.5-8: Python SDK, publishing to PyPI - **Owner:** Backend Team 2. **Story 6.1.3: Developer Portal & Community** (12 points) - T6.1.3.1-8: Portal website, tutorials, community setup - **Owner:** Frontend + Marketing Teams 3. **Documentation: Developer Guides** (8 points) - Getting started guide - Tutorial series - Example projects - **Owner:** Backend + AI Engineer + Marketing Teams 4. **Testing: SDK & Portal Testing** (5 points) - SDK integration testing - Portal UX testing - **Owner:** QA #### Deliverables - ✅ Python SDK published - ✅ Developer portal launched - ✅ Comprehensive developer guides - ✅ Example projects available #### Risks - SDK adoption challenges - Community engagement --- ### Sprint 21: Plugin Architecture **Duration:** Weeks 43-44 **Velocity Target:** 35 points **Sprint Goal:** Implement plugin system and marketplace foundation #### Stories 1. **Story 6.2.1: Plugin System Design** (15 points) - T6.2.1.1-8: Plugin architecture, loader, sandbox, registry - **Owner:** Backend + Architect Teams 2. **Story 6.2.2: Plugin Marketplace (Backend)** (10 points) - T6.2.2.1-4: Plugin listing API, search, ratings backend - **Owner:** Backend Team 3. **Frontend: Plugin Marketplace UI** (7 points) - Plugin browse and search - Installation flow - **Owner:** Frontend Team 4. **Testing: Plugin System Testing** (3 points) - Plugin loading tests - Security testing - **Owner:** QA #### Deliverables - ✅ Plugin system operational - ✅ Marketplace backend ready - ✅ Marketplace UI functional - ✅ Plugin system tested #### Risks - Plugin security vulnerabilities - Plugin API stability --- ### Sprint 22: Plugin Marketplace & Official Plugins **Duration:** Weeks 45-46 **Velocity Target:** 33 points **Sprint Goal:** Complete marketplace and create official plugins #### Stories 1. **Story 6.2.2: Plugin Marketplace (Complete)** (8 points) - T6.2.2.5-8: Updates, security review, publishing - **Owner:** Backend + Frontend Teams 2. **Official Plugins Development** (15 points) - GitHub enhanced integration plugin - Jira import plugin - Export/backup plugin - **Owner:** Backend Team 3. **Documentation: Plugin Developer Guide** (7 points) - Plugin development guide - API reference - Example plugins - **Owner:** Backend + Marketing Teams 4. **Testing: Plugin Quality Assurance** (3 points) - Test official plugins - Marketplace testing - **Owner:** QA #### Deliverables - ✅ Marketplace fully functional - ✅ 3+ official plugins published - ✅ Plugin developer docs complete - ✅ Plugins tested and approved #### Risks - Plugin development complexity - Marketplace stability --- ### Sprint 23: Comprehensive Testing & Bug Bash **Duration:** Weeks 47-48 **Velocity Target:** 30 points **Sprint Goal:** Complete all testing and fix critical bugs #### Stories 1. **Story 6.3.1: Comprehensive Testing & Bug Fixes** (20 points) - T6.3.1.1-8: All testing types, bug fixes - **Owner:** QA + All Teams 2. **Security Audit & Penetration Testing** (5 points) - Third-party security audit - Vulnerability fixes - **Owner:** DevOps + Backend Teams 3. **Performance Tuning** (5 points) - Final performance optimization - Load testing at scale - **Owner:** Backend + DevOps Teams #### Deliverables - ✅ All critical bugs resolved - ✅ Security audit passed - ✅ Performance optimized - ✅ Production ready #### Risks - Unexpected critical bugs - Security vulnerabilities - Performance bottlenecks --- ### Sprint 24: Launch Preparation & Marketing **Duration:** Weeks 49-50 **Velocity Target:** 25 points **Sprint Goal:** Finalize launch materials and execute launch #### Stories 1. **Story 6.3.2: Marketing & Launch Materials** (15 points) - T6.3.2.1-8: Website, demo video, blog, social media, press kit - **Owner:** Marketing + Frontend Teams 2. **Story 6.3.3: Launch & Post-Launch Support** (10 points) - T6.3.3.1-8: Launch checklist, announcement, monitoring - **Owner:** PM + All Teams #### Launch Week Activities - **Day 1:** Soft launch to pilot users - **Day 2:** Launch announcement on social media - **Day 3:** Product Hunt launch - **Day 4:** Blog post and press outreach - **Day 5:** Webinar/demo session - **Days 6-7:** Monitor feedback and metrics #### Deliverables - ✅ Product website live - ✅ Demo video published - ✅ Launch announcement executed - ✅ Support channels operational - ✅ **ColaFlow M6 launched!** #### Post-Launch (Weeks 51-52) - Monitor launch metrics - Respond to user feedback - Hot fixes as needed - Prepare post-launch report #### M6 Retrospective & Project Celebration - Review entire project journey - Analyze launch success - Celebrate team achievements - Plan future roadmap --- ## Resource Allocation Summary ### Team Composition by Milestone | Role | M1 | M2 | M3 | M4 | M5 | M6 | |------|-------|-------|-------|-------|-------|-------| | Product Manager | 0.5 | 0.5 | 0.5 | 0.5 | 1.0 | 1.0 | | Architect | 0.5 | 0.3 | 0.2 | 0.2 | 0.3 | 0.5 | | Backend Engineers | 2.0 | 2.0 | 1.0 | 2.0 | 2.0 | 2.0 | | Frontend Engineers | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | | AI Engineer | - | 1.0 | 1.0 | - | - | 0.5 | | QA Engineer | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | | DevOps Engineer | - | - | - | - | 1.0 | 1.0 | | Marketing | - | - | - | - | - | 1.0 | | **Total FTE** | **5.0** | **5.8** | **4.7** | **4.7** | **6.3** | **8.0** | ### Budget Considerations **Personnel Costs (Estimated):** - Backend Engineers: $120k-150k/year each - Frontend Engineers: $110k-140k/year each - AI Engineer: $140k-170k/year - DevOps Engineer: $130k-160k/year - QA Engineer: $90k-120k/year - Product Manager: $130k-160k/year - Architect: $150k-180k/year - Marketing: $100k-130k/year **Infrastructure Costs:** - Development environment: $500-1000/month - Staging environment: $1000-2000/month - Production (pilot): $2000-3000/month - Production (launch): $3000-5000/month - CI/CD tools: $500/month - Monitoring & logging: $500/month **AI API Costs:** - OpenAI API: $500-2000/month (varies with usage) - Anthropic Claude API: $500-2000/month (varies with usage) **Other Costs:** - Design tools: $200/month - Project management tools: $100/month - Testing tools: $300/month - Domain & SSL: $100/year - Third-party services: $500/month --- ## Risk Management Plan ### Critical Risks by Milestone **M1 Risks:** - ⚠️ **HIGH**: Team onboarding delays → Mitigation: Early hiring, comprehensive onboarding - ⚠️ **MEDIUM**: Database schema changes → Mitigation: Careful design, migration testing - ⚠️ **LOW**: UI/UX challenges → Mitigation: Early prototyping, user feedback **M2 Risks:** - ⚠️ **HIGH**: MCP protocol changes → Mitigation: Follow MCP updates, flexible architecture - ⚠️ **MEDIUM**: Security vulnerabilities → Mitigation: Security reviews, penetration testing - ⚠️ **LOW**: Performance issues → Mitigation: Early performance testing **M3 Risks:** - ⚠️ **HIGH**: AI output quality → Mitigation: Extensive prompt engineering, testing - ⚠️ **HIGH**: OpenAI API costs → Mitigation: Cost monitoring, usage optimization - ⚠️ **MEDIUM**: GPT configuration limitations → Mitigation: Explore alternatives **M4 Risks:** - ⚠️ **MEDIUM**: GitHub API rate limits → Mitigation: Caching, request optimization - ⚠️ **MEDIUM**: Integration reliability → Mitigation: Retry mechanisms, error handling - ⚠️ **LOW**: Third-party API changes → Mitigation: Version pinning, monitoring **M5 Risks:** - ⚠️ **HIGH**: Pilot user adoption → Mitigation: Excellent onboarding, support - ⚠️ **MEDIUM**: Performance at scale → Mitigation: Load testing, optimization - ⚠️ **MEDIUM**: Security compliance → Mitigation: External audit, documentation **M6 Risks:** - ⚠️ **HIGH**: Launch timing delays → Mitigation: Buffer time, phased launch - ⚠️ **MEDIUM**: Plugin ecosystem adoption → Mitigation: Official plugins, marketing - ⚠️ **LOW**: Documentation completeness → Mitigation: Continuous documentation --- ## Success Criteria by Milestone ### M1 Success Criteria ✅ Complete project hierarchy (Epic/Story/Task/Sub-task) ✅ Functional Kanban board with drag-and-drop ✅ Workflow system with customization ✅ Audit log and rollback capability ✅ All M1 stories complete and tested ### M2 Success Criteria ✅ MCP server running and secure ✅ All planned resources and tools exposed ✅ Diff preview system operational ✅ AI control console functional ✅ Successfully tested with MCP client ### M3 Success Criteria ✅ AI task generation working ✅ Automated reporting functional ✅ ColaFlow GPT live and usable ✅ Internal team using AI features ✅ Positive feedback on AI capabilities ### M4 Success Criteria ✅ GitHub integration complete and stable ✅ Slack integration functional ✅ Calendar sync working ✅ All integrations documented ✅ Multi-integration workflows tested ### M5 Success Criteria ✅ Enterprise features implemented (SSO, permissions, compliance) ✅ Performance optimized (meets SLA) ✅ Pilot deployment successful ✅ User feedback collected and analyzed ✅ Ready for public launch ### M6 Success Criteria ✅ Complete API documentation and SDKs ✅ Plugin system and marketplace live ✅ All testing passed (functional, security, performance) ✅ Marketing materials ready ✅ Successful public launch ✅ Post-launch metrics tracking --- ## Sprint Cadence & Ceremonies ### Sprint Planning (Day 1) - Review backlog and priorities - Estimate stories (planning poker) - Commit to sprint goal and stories - Create detailed tasks - **Duration:** 2-4 hours ### Daily Standup (Every day) - What did I do yesterday? - What will I do today? - Any blockers? - **Duration:** 15 minutes ### Sprint Review (Last day PM) - Demo completed stories - Gather stakeholder feedback - Accept/reject stories - **Duration:** 1-2 hours ### Sprint Retrospective (Last day EOD) - What went well? - What could be improved? - Action items for next sprint - **Duration:** 1 hour ### Backlog Refinement (Mid-sprint) - Review and estimate upcoming stories - Clarify requirements - Identify dependencies - **Duration:** 1-2 hours --- ## Appendix: Sprint Velocity Tracking ### Velocity Chart (Planned) ``` Story Points 40 | ╱───── 35 | ╱─────── 30 | ╱─────────── 25 | ╱─────────────── 20 | ───────── 15 | 10 | 5 | +------------------------------------------------------------ 1 3 5 7 9 11 13 15 17 19 21 23 Sprint Number ``` ### Velocity Goals - **Sprints 1-4 (M1):** 20-25 points (team forming) - **Sprints 5-8 (M2):** 25-29 points (team norming) - **Sprints 9-12 (M3):** 28-30 points (steady state) - **Sprints 13-16 (M4):** 28-31 points (steady state) - **Sprints 17-18 (M5):** 30-32 points (focused sprint) - **Sprints 19-24 (M6):** 25-35 points (variable for launch activities) --- **Document Status:** Draft - Ready for team review and sprint kickoff **Next Steps:** 1. Review sprint plan with team 2. Refine estimates based on team input 3. Set up sprint tracking in project management tool 4. Begin Sprint 1 planning 5. Kickoff ColaFlow development!