Sprint 3: Frontend Code Quality Optimization
Milestone: M1 - Core Project Module (Quality Improvement) Goal: Complete frontend code quality optimization based on code review findings to improve type safety, performance, and maintainability.
Sprint Context
Background: Following the completion of M1 core features (Sprint 1-2), a comprehensive frontend code review was conducted on 2025-11-05. The review identified several code quality issues that need to be addressed before moving to M2 MCP Server implementation.
Review Report: FRONTEND_CODE_REVIEW_REPORT.md
Already Fixed (Git commit ea67d90):
- ✅ Eliminated all
anytypes and type assertions - ✅ Merged duplicate User type definitions
- ✅ Replaced console.log in core modules with logger utility
- ✅ Fixed hardcoded user IDs
- ✅ Added React.memo and useCallback optimizations
- ✅ IssueCard type safety improvements
Sprint Objectives
- Complete Logging Utility Migration - Replace all remaining console.log statements
- Optimize Component Performance - Add React.memo to all list components
- Fix Next.js 15 Compatibility - Update all pages to use async params pattern
- Improve Error Handling - Add error boundaries and better error messages
- Enhance Accessibility - Improve ARIA labels and keyboard navigation
- Enforce Code Quality - Add ESLint rules and pre-commit hooks
Implementation Guide
Complete Implementation Guide: SPRINT_3_IMPLEMENTATION_GUIDE.md
The comprehensive implementation guide contains:
- All 6 Stories with detailed descriptions and acceptance criteria
- All 35 Tasks with step-by-step implementation instructions
- Code examples for each task
- Testing and verification procedures
- Timeline and resource planning
Stories Summary
- Story 1 - Complete Logging Utility Migration (6 tasks) -
not_started- P1 High - 1-2 days - Story 2 - Component Performance Optimization (6 tasks) -
not_started- P1 High - 2-3 days - Story 3 - Next.js 15 Async Params Migration (5 tasks) -
not_started- P0 Critical - 1 day - Story 4 - Error Handling Improvements (6 tasks) -
not_started- P1 High - 2 days - Story 5 - Accessibility Enhancements (6 tasks) -
not_started- P2 Medium - 2-3 days - Story 6 - Code Quality Tooling (6 tasks) -
not_started- P2 Medium - 1 day
Progress: 0/6 stories, 0/35 tasks completed (0%)
Sprint Scope Summary
Story 1: Complete Logging Utility Migration
Priority: P1 (High) Estimated: 1-2 days Owner: Frontend Team
Scope:
- Replace console.log in
lib/hooks/use-projects.ts - Replace console.log in
lib/hooks/use-stories.ts - Replace console.log in
lib/hooks/use-tasks.ts - Replace console.log in other React Query hooks
- Replace console.log in SignalR-related files
- Update all error logging to use structured logging
Acceptance Criteria:
- No console.log statements in React Query hooks
- No console.log statements in SignalR files
- All logging goes through logger utility
- Development logs are verbose, production logs are minimal
- Error logs are properly sent to error tracking service
Story 2: Component Performance Optimization
Priority: P1 (High) Estimated: 2-3 days Owner: Frontend Team
Scope:
- Add React.memo to ProjectCard component
- Add React.memo to SprintCard component
- Add React.memo to TaskCard component
- Add React.memo to other list components
- Add useCallback to all event handlers in list components
- Performance testing and benchmarking
Acceptance Criteria:
- All list components wrapped with React.memo
- All event handlers use useCallback with proper dependencies
- Performance improvement verified (reduced re-renders)
- No performance regressions
- Lighthouse performance score >= 90
Story 3: Next.js 15 Async Params Migration
Priority: P0 (Critical) Estimated: 1 day Owner: Frontend Team
Scope:
- Update
app/projects/[id]/page.tsxto use async params - Update all other dynamic route pages
- Verify Next.js 15 compatibility
- Update TypeScript types for page props
Acceptance Criteria:
- All dynamic pages use
await paramspattern - No TypeScript errors in page components
- All routes work correctly in Next.js 15
- No hydration warnings
Story 4: Error Handling Improvements
Priority: P1 (High) Estimated: 2 days Owner: Frontend Team
Scope:
- Create global Error Boundary component
- Add route-level error boundaries
- Improve error messages in forms
- Add loading state improvements
- Add empty state components
Acceptance Criteria:
- Error boundaries catch and display errors gracefully
- All forms show clear error messages
- All data fetching shows loading states
- Empty states provide helpful guidance
- Error tracking integration working
Story 5: Accessibility Enhancements
Priority: P2 (Medium) Estimated: 2-3 days Owner: Frontend Team
Scope:
- Add ARIA labels to all interactive cards
- Improve keyboard navigation in kanban board
- Add focus management for dialogs
- Verify screen reader compatibility
- Add skip navigation links
Acceptance Criteria:
- All interactive elements have proper ARIA labels
- Keyboard navigation works for all features
- Tab order is logical
- Screen reader announces changes properly
- WCAG 2.1 Level AA compliance
Story 6: Code Quality Tooling
Priority: P2 (Medium) Estimated: 1 day Owner: Frontend Team
Scope:
- Configure ESLint rules to forbid
anytype - Add TypeScript strict mode checks
- Configure pre-commit hooks (Husky + lint-staged)
- Add Prettier format checking
- Configure VS Code recommended settings
Acceptance Criteria:
- ESLint fails on
anytype usage - Pre-commit hooks prevent bad code
- Code is auto-formatted on commit
- TypeScript strict mode enforced
- Team has consistent VS Code settings
Timeline
Week 1 (Nov 5-8):
- Day 1: Story 1 - Logging Utility Migration (50%)
- Day 2: Story 1 - Complete (50%)
- Day 3: Story 3 - Next.js 15 Migration (100%)
Week 2 (Nov 11-15):
- Day 4-5: Story 2 - Performance Optimization (Days 1-2)
- Day 6: Story 2 - Complete + Performance Testing (Day 3)
Week 3 (Nov 18-19):
- Day 7-8: Story 4 - Error Handling
- Day 9-10: Story 5 - Accessibility
Week 4 (Nov 19):
- Day 11: Story 6 - Code Quality Tooling
Definition of Done
- All 6 stories completed with acceptance criteria met
- All TypeScript errors resolved
- ESLint passing with no warnings
- No console.log statements in production code
- Lighthouse performance score >= 90
- WCAG 2.1 Level AA compliance
- Code reviewed and approved
- Frontend tests passing (>= 80% coverage)
- No performance regressions
- Documentation updated
Success Metrics
Code Quality Metrics
- Type Safety: 6/10 → 9/10 (Target: eliminate all
anytypes) - Performance: 6/10 → 8/10 (Target: React.memo + useCallback everywhere)
- Accessibility: 7/10 → 9/10 (Target: WCAG 2.1 Level AA)
- Overall Quality: 7.1/10 → 9/10
Performance Metrics
- Lighthouse Performance: Current unknown → Target >= 90
- First Contentful Paint: Target < 1.5s
- Time to Interactive: Target < 3s
- React Re-renders: Target 50% reduction
Developer Experience
- ESLint Warnings: Current unknown → Target 0
- TypeScript Errors: Current 0 → Target 0 (maintain)
- Pre-commit Hook Success Rate: Target >= 95%
- Code Review Turnaround: Target < 4 hours
Dependencies
Prerequisites:
- ✅ Sprint 1 completed (Frontend Integration)
- ✅ Sprint 2 completed (M1 Backend Features)
- ✅ Frontend code review completed (FRONTEND_CODE_REVIEW_REPORT.md)
- ✅ Initial fixes completed (Git commit
ea67d90)
Technical Requirements:
- Next.js 15+ (already installed)
- React 19+ (already installed)
- TypeScript 5.0+ (already configured)
- ESLint 8.0+ (needs rule updates)
- Husky 8.0+ (needs installation)
- lint-staged (needs installation)
Risks & Mitigation
Risk Matrix
| Risk ID | Description | Impact | Probability | Mitigation | Owner |
|---|---|---|---|---|---|
| RISK-001 | React.memo breaks existing behavior | High | Low | Thorough testing before/after | Frontend Lead |
| RISK-002 | Performance optimization takes longer | Medium | Medium | Prioritize critical components first | Frontend Dev |
| RISK-003 | Next.js 15 migration breaks routes | High | Low | Test all routes thoroughly | Frontend Dev |
| RISK-004 | ESLint rules too strict | Low | Medium | Iteratively tune rules | Frontend Lead |
| RISK-005 | Pre-commit hooks slow down workflow | Low | Medium | Optimize hook performance | Frontend Dev |
Related Documents
Planning Documents
Code Review
- Frontend Code Review Report
- Git Commit:
ea67d90(Initial fixes)
Technical References
Notes
Code Review Findings Summary
Critical Issues Fixed (Git commit ea67d90):
- ✅ Eliminated 60+
anytypes - ✅ Fixed 15+
as anytype assertions - ✅ Merged duplicate User type definitions
- ✅ Fixed IssueCard type safety with discriminated unions
- ✅ Fixed API client type parameters
- ✅ Fixed SignalR event types
- ✅ Replaced console.log in core modules
Remaining Work (This Sprint):
- 🔲 Complete logging utility migration (Story 1)
- 🔲 Add React.memo to list components (Story 2)
- 🔲 Fix Next.js 15 async params (Story 3)
- 🔲 Add error boundaries (Story 4)
- 🔲 Improve accessibility (Story 5)
- 🔲 Configure code quality tools (Story 6)
Why This Sprint Matters
For Users:
- Faster, more responsive UI (React.memo optimization)
- Better error messages (Error boundaries)
- Improved accessibility (ARIA labels, keyboard nav)
- More reliable application (Type safety)
For Developers:
- Safer refactoring (Type safety)
- Faster debugging (Structured logging)
- Consistent code style (ESLint + Prettier)
- Fewer bugs in production (Pre-commit hooks)
For Product:
- Higher quality codebase before M2
- Better foundation for AI integration
- Improved maintainability
- Reduced technical debt
Story Creation
Frontend agent will create detailed Story and Task files for this Sprint based on:
- Frontend Code Review Report findings
- Initial fixes already completed
- Next.js 15 best practices
- React performance optimization patterns
- WCAG 2.1 accessibility guidelines
Created: 2025-11-05 by Product Manager Agent Next Review: 2025-11-12 (mid-sprint checkpoint) Sprint Duration: 2 weeks (10 working days) Target Completion: 2025-11-19