Files
ColaFlow/docs/plans/sprint_4_story_3.md
Yaojia Wang 88d6413f81 feat(frontend): Create Sprint 4 Stories and Tasks for Story Management
Created comprehensive Story and Task files for Sprint 4 frontend implementation:

Story 1: Story Detail Page Foundation (P0 Critical - 3 days)
- 6 tasks: route creation, header, sidebar, data loading, Edit/Delete, responsive design
- Fixes critical 404 error when clicking Story cards
- Two-column layout consistent with Epic detail page

Story 2: Task Management in Story Detail (P0 Critical - 2 days)
- 6 tasks: API verification, hooks, TaskList, TaskCard, TaskForm, integration
- Complete Task CRUD with checkbox status toggle
- Filters, sorting, and optimistic UI updates

Story 3: Enhanced Story Form (P1 High - 2 days)
- 6 tasks: acceptance criteria, assignee selector, tags, story points, integration
- Aligns with UX design specification
- Backward compatible with existing Stories

Story 4: Quick Add Story Workflow (P1 High - 2 days)
- 5 tasks: inline form, keyboard shortcuts, batch creation, navigation
- Rapid Story creation with minimal fields
- Keyboard shortcut (Cmd/Ctrl + N)

Story 5: Story Card Component (P2 Medium - 1 day)
- 4 tasks: component variants, visual states, Task count, optimization
- Reusable component with list/kanban/compact variants
- React.memo optimization

Story 6: Kanban Story Creation Enhancement (P2 Optional - 2 days)
- 4 tasks: Epic card enhancement, inline form, animation, real-time updates
- Contextual Story creation from Kanban
- Stretch goal - implement only if ahead of schedule

Total: 6 Stories, 31 Tasks, 12 days estimated
Priority breakdown: P0 (2), P1 (2), P2 (2 optional)

🤖 Generated with [Claude Code](https://claude.com/claude-code)

Co-Authored-By: Claude <noreply@anthropic.com>
2025-11-05 21:49:57 +01:00

1.7 KiB

story_id, sprint, priority, status, story_points, estimated_days, created_date, assignee
story_id sprint priority status story_points estimated_days created_date assignee
sprint_4_story_3 sprint_4 P1 not_started 3 2 2025-11-05 Frontend Team

Story 3: Enhanced Story Form

Sprint: Sprint 4 Priority: P1 (High) Estimated: 2 days Owner: Frontend Team

Description

Enhance the existing Story form component to include UX-designed fields: Acceptance Criteria (checkbox list), Assignee selector, Tags/Labels (multi-select), and Story Points. This improves Story planning capabilities and aligns with the comprehensive UX design.

User Story

As a product manager, I want to add acceptance criteria, assignee, tags, and story points when creating Stories, So that I can better plan and communicate Story requirements.

Acceptance Criteria

  • Form includes Acceptance Criteria field (dynamic checkbox list)
  • Form includes Assignee selector (searchable dropdown showing users)
  • Form includes Tags field (multi-select labels)
  • Form includes Story Points field (optional numeric)
  • Acceptance criteria can be added/removed dynamically
  • Tags support multi-select
  • Form validation works for all fields
  • Backward compatible with existing Stories (missing fields are optional)
  • Form saves correctly with all new fields

Tasks

  • Task 1: Add Acceptance Criteria editor component
  • Task 2: Implement Assignee selector component
  • Task 3: Add Tags/Labels multi-select component
  • Task 4: Add Story Points field and update schema
  • Task 5: Integrate all new fields into Story form
  • Task 6: Update Story types and API client

Progress: 0/6 tasks completed

Estimated Time

2 days (16 hours)


Created: 2025-11-05 by Frontend Agent