Includes: CLAUDE.md, settings.json, agents, commands, rules, skills, hooks, contexts, evals, get-shit-done, plugin configs (installed list and marketplace sources). Excludes credentials, runtime caches, telemetry, session data, and plugin binary cache.
333 lines
12 KiB
Markdown
333 lines
12 KiB
Markdown
<purpose>
|
|
Verify milestone achieved its definition of done by aggregating phase verifications, checking cross-phase integration, and assessing requirements coverage. Reads existing VERIFICATION.md files (phases already verified during execute-phase), aggregates tech debt and deferred gaps, then spawns integration checker for cross-phase wiring.
|
|
</purpose>
|
|
|
|
<required_reading>
|
|
Read all files referenced by the invoking prompt's execution_context before starting.
|
|
</required_reading>
|
|
|
|
<process>
|
|
|
|
## 0. Initialize Milestone Context
|
|
|
|
```bash
|
|
INIT=$(node "C:/Users/yaoji/.claude/get-shit-done/bin/gsd-tools.cjs" init milestone-op)
|
|
if [[ "$INIT" == @file:* ]]; then INIT=$(cat "${INIT#@file:}"); fi
|
|
```
|
|
|
|
Extract from init JSON: `milestone_version`, `milestone_name`, `phase_count`, `completed_phases`, `commit_docs`.
|
|
|
|
Resolve integration checker model:
|
|
```bash
|
|
integration_checker_model=$(node "C:/Users/yaoji/.claude/get-shit-done/bin/gsd-tools.cjs" resolve-model gsd-integration-checker --raw)
|
|
```
|
|
|
|
## 1. Determine Milestone Scope
|
|
|
|
```bash
|
|
# Get phases in milestone (sorted numerically, handles decimals)
|
|
node "C:/Users/yaoji/.claude/get-shit-done/bin/gsd-tools.cjs" phases list
|
|
```
|
|
|
|
- Parse version from arguments or detect current from ROADMAP.md
|
|
- Identify all phase directories in scope
|
|
- Extract milestone definition of done from ROADMAP.md
|
|
- Extract requirements mapped to this milestone from REQUIREMENTS.md
|
|
|
|
## 2. Read All Phase Verifications
|
|
|
|
For each phase directory, read the VERIFICATION.md:
|
|
|
|
```bash
|
|
# For each phase, use find-phase to resolve the directory (handles archived phases)
|
|
PHASE_INFO=$(node "C:/Users/yaoji/.claude/get-shit-done/bin/gsd-tools.cjs" find-phase 01 --raw)
|
|
# Extract directory from JSON, then read VERIFICATION.md from that directory
|
|
# Repeat for each phase number from ROADMAP.md
|
|
```
|
|
|
|
From each VERIFICATION.md, extract:
|
|
- **Status:** passed | gaps_found
|
|
- **Critical gaps:** (if any — these are blockers)
|
|
- **Non-critical gaps:** tech debt, deferred items, warnings
|
|
- **Anti-patterns found:** TODOs, stubs, placeholders
|
|
- **Requirements coverage:** which requirements satisfied/blocked
|
|
|
|
If a phase is missing VERIFICATION.md, flag it as "unverified phase" — this is a blocker.
|
|
|
|
## 3. Spawn Integration Checker
|
|
|
|
With phase context collected:
|
|
|
|
Extract `MILESTONE_REQ_IDS` from REQUIREMENTS.md traceability table — all REQ-IDs assigned to phases in this milestone.
|
|
|
|
```
|
|
Task(
|
|
prompt="Check cross-phase integration and E2E flows.
|
|
|
|
Phases: {phase_dirs}
|
|
Phase exports: {from SUMMARYs}
|
|
API routes: {routes created}
|
|
|
|
Milestone Requirements:
|
|
{MILESTONE_REQ_IDS — list each REQ-ID with description and assigned phase}
|
|
|
|
MUST map each integration finding to affected requirement IDs where applicable.
|
|
|
|
Verify cross-phase wiring and E2E user flows.",
|
|
subagent_type="gsd-integration-checker",
|
|
model="{integration_checker_model}"
|
|
)
|
|
```
|
|
|
|
## 4. Collect Results
|
|
|
|
Combine:
|
|
- Phase-level gaps and tech debt (from step 2)
|
|
- Integration checker's report (wiring gaps, broken flows)
|
|
|
|
## 5. Check Requirements Coverage (3-Source Cross-Reference)
|
|
|
|
MUST cross-reference three independent sources for each requirement:
|
|
|
|
### 5a. Parse REQUIREMENTS.md Traceability Table
|
|
|
|
Extract all REQ-IDs mapped to milestone phases from the traceability table:
|
|
- Requirement ID, description, assigned phase, current status, checked-off state (`[x]` vs `[ ]`)
|
|
|
|
### 5b. Parse Phase VERIFICATION.md Requirements Tables
|
|
|
|
For each phase's VERIFICATION.md, extract the expanded requirements table:
|
|
- Requirement | Source Plan | Description | Status | Evidence
|
|
- Map each entry back to its REQ-ID
|
|
|
|
### 5c. Extract SUMMARY.md Frontmatter Cross-Check
|
|
|
|
For each phase's SUMMARY.md, extract `requirements-completed` from YAML frontmatter:
|
|
```bash
|
|
for summary in .planning/phases/*-*/*-SUMMARY.md; do
|
|
node "C:/Users/yaoji/.claude/get-shit-done/bin/gsd-tools.cjs" summary-extract "$summary" --fields requirements_completed | jq -r '.requirements_completed'
|
|
done
|
|
```
|
|
|
|
### 5d. Status Determination Matrix
|
|
|
|
For each REQ-ID, determine status using all three sources:
|
|
|
|
| VERIFICATION.md Status | SUMMARY Frontmatter | REQUIREMENTS.md | → Final Status |
|
|
|------------------------|---------------------|-----------------|----------------|
|
|
| passed | listed | `[x]` | **satisfied** |
|
|
| passed | listed | `[ ]` | **satisfied** (update checkbox) |
|
|
| passed | missing | any | **partial** (verify manually) |
|
|
| gaps_found | any | any | **unsatisfied** |
|
|
| missing | listed | any | **partial** (verification gap) |
|
|
| missing | missing | any | **unsatisfied** |
|
|
|
|
### 5e. FAIL Gate and Orphan Detection
|
|
|
|
**REQUIRED:** Any `unsatisfied` requirement MUST force `gaps_found` status on the milestone audit.
|
|
|
|
**Orphan detection:** Requirements present in REQUIREMENTS.md traceability table but absent from ALL phase VERIFICATION.md files MUST be flagged as orphaned. Orphaned requirements are treated as `unsatisfied` — they were assigned but never verified by any phase.
|
|
|
|
## 5.5. Nyquist Compliance Discovery
|
|
|
|
Skip if `workflow.nyquist_validation` is explicitly `false` (absent = enabled).
|
|
|
|
```bash
|
|
NYQUIST_CONFIG=$(node "C:/Users/yaoji/.claude/get-shit-done/bin/gsd-tools.cjs" config get workflow.nyquist_validation --raw 2>/dev/null)
|
|
```
|
|
|
|
If `false`: skip entirely.
|
|
|
|
For each phase directory, check `*-VALIDATION.md`. If exists, parse frontmatter (`nyquist_compliant`, `wave_0_complete`).
|
|
|
|
Classify per phase:
|
|
|
|
| Status | Condition |
|
|
|--------|-----------|
|
|
| COMPLIANT | `nyquist_compliant: true` and all tasks green |
|
|
| PARTIAL | VALIDATION.md exists, `nyquist_compliant: false` or red/pending |
|
|
| MISSING | No VALIDATION.md |
|
|
|
|
Add to audit YAML: `nyquist: { compliant_phases, partial_phases, missing_phases, overall }`
|
|
|
|
Discovery only — never auto-calls `/gsd:validate-phase`.
|
|
|
|
## 6. Aggregate into v{version}-MILESTONE-AUDIT.md
|
|
|
|
Create `.planning/v{version}-v{version}-MILESTONE-AUDIT.md` with:
|
|
|
|
```yaml
|
|
---
|
|
milestone: {version}
|
|
audited: {timestamp}
|
|
status: passed | gaps_found | tech_debt
|
|
scores:
|
|
requirements: N/M
|
|
phases: N/M
|
|
integration: N/M
|
|
flows: N/M
|
|
gaps: # Critical blockers
|
|
requirements:
|
|
- id: "{REQ-ID}"
|
|
status: "unsatisfied | partial | orphaned"
|
|
phase: "{assigned phase}"
|
|
claimed_by_plans: ["{plan files that reference this requirement}"]
|
|
completed_by_plans: ["{plan files whose SUMMARY marks it complete}"]
|
|
verification_status: "passed | gaps_found | missing | orphaned"
|
|
evidence: "{specific evidence or lack thereof}"
|
|
integration: [...]
|
|
flows: [...]
|
|
tech_debt: # Non-critical, deferred
|
|
- phase: 01-auth
|
|
items:
|
|
- "TODO: add rate limiting"
|
|
- "Warning: no password strength validation"
|
|
- phase: 03-dashboard
|
|
items:
|
|
- "Deferred: mobile responsive layout"
|
|
---
|
|
```
|
|
|
|
Plus full markdown report with tables for requirements, phases, integration, tech debt.
|
|
|
|
**Status values:**
|
|
- `passed` — all requirements met, no critical gaps, minimal tech debt
|
|
- `gaps_found` — critical blockers exist
|
|
- `tech_debt` — no blockers but accumulated deferred items need review
|
|
|
|
## 7. Present Results
|
|
|
|
Route by status (see `<offer_next>`).
|
|
|
|
</process>
|
|
|
|
<offer_next>
|
|
Output this markdown directly (not as a code block). Route based on status:
|
|
|
|
---
|
|
|
|
**If passed:**
|
|
|
|
## ✓ Milestone {version} — Audit Passed
|
|
|
|
**Score:** {N}/{M} requirements satisfied
|
|
**Report:** .planning/v{version}-MILESTONE-AUDIT.md
|
|
|
|
All requirements covered. Cross-phase integration verified. E2E flows complete.
|
|
|
|
───────────────────────────────────────────────────────────────
|
|
|
|
## ▶ Next Up
|
|
|
|
**Complete milestone** — archive and tag
|
|
|
|
/gsd:complete-milestone {version}
|
|
|
|
<sub>/clear first → fresh context window</sub>
|
|
|
|
───────────────────────────────────────────────────────────────
|
|
|
|
---
|
|
|
|
**If gaps_found:**
|
|
|
|
## ⚠ Milestone {version} — Gaps Found
|
|
|
|
**Score:** {N}/{M} requirements satisfied
|
|
**Report:** .planning/v{version}-MILESTONE-AUDIT.md
|
|
|
|
### Unsatisfied Requirements
|
|
|
|
{For each unsatisfied requirement:}
|
|
- **{REQ-ID}: {description}** (Phase {X})
|
|
- {reason}
|
|
|
|
### Cross-Phase Issues
|
|
|
|
{For each integration gap:}
|
|
- **{from} → {to}:** {issue}
|
|
|
|
### Broken Flows
|
|
|
|
{For each flow gap:}
|
|
- **{flow name}:** breaks at {step}
|
|
|
|
### Nyquist Coverage
|
|
|
|
| Phase | VALIDATION.md | Compliant | Action |
|
|
|-------|---------------|-----------|--------|
|
|
| {phase} | exists/missing | true/false/partial | `/gsd:validate-phase {N}` |
|
|
|
|
Phases needing validation: run `/gsd:validate-phase {N}` for each flagged phase.
|
|
|
|
───────────────────────────────────────────────────────────────
|
|
|
|
## ▶ Next Up
|
|
|
|
**Plan gap closure** — create phases to complete milestone
|
|
|
|
/gsd:plan-milestone-gaps
|
|
|
|
<sub>/clear first → fresh context window</sub>
|
|
|
|
───────────────────────────────────────────────────────────────
|
|
|
|
**Also available:**
|
|
- cat .planning/v{version}-MILESTONE-AUDIT.md — see full report
|
|
- /gsd:complete-milestone {version} — proceed anyway (accept tech debt)
|
|
|
|
───────────────────────────────────────────────────────────────
|
|
|
|
---
|
|
|
|
**If tech_debt (no blockers but accumulated debt):**
|
|
|
|
## ⚡ Milestone {version} — Tech Debt Review
|
|
|
|
**Score:** {N}/{M} requirements satisfied
|
|
**Report:** .planning/v{version}-MILESTONE-AUDIT.md
|
|
|
|
All requirements met. No critical blockers. Accumulated tech debt needs review.
|
|
|
|
### Tech Debt by Phase
|
|
|
|
{For each phase with debt:}
|
|
**Phase {X}: {name}**
|
|
- {item 1}
|
|
- {item 2}
|
|
|
|
### Total: {N} items across {M} phases
|
|
|
|
───────────────────────────────────────────────────────────────
|
|
|
|
## ▶ Options
|
|
|
|
**A. Complete milestone** — accept debt, track in backlog
|
|
|
|
/gsd:complete-milestone {version}
|
|
|
|
**B. Plan cleanup phase** — address debt before completing
|
|
|
|
/gsd:plan-milestone-gaps
|
|
|
|
<sub>/clear first → fresh context window</sub>
|
|
|
|
───────────────────────────────────────────────────────────────
|
|
</offer_next>
|
|
|
|
<success_criteria>
|
|
- [ ] Milestone scope identified
|
|
- [ ] All phase VERIFICATION.md files read
|
|
- [ ] SUMMARY.md `requirements-completed` frontmatter extracted for each phase
|
|
- [ ] REQUIREMENTS.md traceability table parsed for all milestone REQ-IDs
|
|
- [ ] 3-source cross-reference completed (VERIFICATION + SUMMARY + traceability)
|
|
- [ ] Orphaned requirements detected (in traceability but absent from all VERIFICATIONs)
|
|
- [ ] Tech debt and deferred gaps aggregated
|
|
- [ ] Integration checker spawned with milestone requirement IDs
|
|
- [ ] v{version}-MILESTONE-AUDIT.md created with structured requirement gap objects
|
|
- [ ] FAIL gate enforced — any unsatisfied requirement forces gaps_found status
|
|
- [ ] Nyquist compliance scanned for all milestone phases (if enabled)
|
|
- [ ] Missing VALIDATION.md phases flagged with validate-phase suggestion
|
|
- [ ] Results presented with actionable next steps
|
|
</success_criteria>
|