12 KiB
story_id, sprint_id, parent_story_id, status, priority, assignee, created_date, estimated_days, phase
| story_id | sprint_id | parent_story_id | status | priority | assignee | created_date | estimated_days | phase |
|---|---|---|---|---|---|---|---|---|
| story_17 | sprint_5 | story_0 | not_started | P0 | backend | 2025-11-09 | 10 | 5 |
Story 17: Testing, Optimization & Documentation
Parent Epic: Story 0 - Integrate Microsoft .NET MCP SDK Phase: 5 - Testing & Optimization (Week 7-8) Priority: P0 - Critical Estimated Effort: 10 days (2 weeks) Dependencies: Story 16 (Transport migration complete)
User Story
As a backend team lead, I want comprehensive testing, performance optimization, and documentation for MCP SDK integration, So that we have production-ready code with zero regressions and complete knowledge transfer.
Business Value
- Quality Assurance: Zero CRITICAL bugs in production
- Performance Validation: Confirm ≥20% improvement target met
- Security Confidence: Pass security audit with zero HIGH vulnerabilities
- Team Knowledge: Complete documentation for future maintenance
- Production Ready: Confident deployment with rollback plan
Week 7: Integration Testing & Bug Fixes
7.1 End-to-End Integration Testing (2 days)
Test Scenarios:
-
Claude Desktop Integration (stdio)
- Initialize handshake
- List Tools and Resources
- Call each Tool (10 total)
- Query each Resource (11 total)
- Verify Diff Preview workflow
- Test approval/rejection flow
-
Web Client Integration (HTTP/SSE)
- HTTP POST requests to MCP endpoints
- SSE connection for notifications
- API Key authentication
- CORS preflight handling
-
Multi-Tenant Isolation
- Create 2 test tenants
- Verify cross-tenant data access blocked
- Test API Keys scoped to tenants
- Validate Global Query Filters
-
Error Handling
- Invalid API Key
- Missing required parameters
- Malformed JSON-RPC requests
- Network failures (timeout, disconnect)
Deliverables:
- Integration test suite (50+ test cases)
- Test execution report
- Bug tracking spreadsheet
7.2 Performance Testing & Optimization (2 days)
Baseline vs. Target Performance:
| Metric | Baseline (Custom) | Target (SDK) | Actual (Measured) |
|---|---|---|---|
| Tool Execution (P95) | 150ms | 120ms (20% faster) | TBD |
| Resource Query (P95) | 120ms | 85ms (30% faster) | TBD |
| Throughput | 70 req/s | 100 req/s | TBD |
| Memory Usage | 180 MB | 150 MB (15% less) | TBD |
Performance Tests:
-
Load Testing (Apache Bench or k6)
- 100 concurrent users
- 1000 requests total
- Measure P50, P95, P99 latency
-
Memory Profiling (dotMemory)
- Baseline memory usage
- Peak memory under load
- Memory leak detection
-
Database Query Performance
- EF Core query analysis
- Index usage verification
- N+1 query detection
Optimization Tasks (if needed):
- Add missing database indexes
- Optimize Redis cache keys
- Tune connection pool sizes
- Enable HTTP response compression
Deliverables:
- Performance benchmark report
- Optimization recommendations
- Before/after comparison charts
7.3 Security Audit (1 day)
Security Tests:
-
Authentication & Authorization
- API Key brute force attempt (rate limiting)
- Expired API Key handling
- Invalid API Key handling
- Field-level permission bypass attempts
-
Multi-Tenant Security
- Cross-tenant data access attempts
- SQL injection attempts (parameterized queries)
- JSONB injection attempts
- Path traversal attempts (Resource URIs)
-
Input Validation
- Tool parameter validation
- Resource URI validation
- JSON-RPC message validation
- CSRF protection (HTTP transport)
-
Sensitive Data Exposure
- Log scrubbing (no API Keys, passwords logged)
- Error messages (no stack traces to clients)
- HTTPS enforcement (production)
Security Checklist:
- OWASP Top 10 compliance
- API Key BCrypt hashed (never plaintext)
- HTTPS only (production)
- Rate limiting enabled
- CORS properly configured
- SQL injection protected (EF Core parameterized)
- XSS protection (JSON escaping)
- Sensitive data not logged
Deliverables:
- Security audit report (PASS/FAIL per category)
- Vulnerability remediation plan (if issues found)
7.4 Bug Fixes & Refinement (1 day)
Bug Triage Process:
- Categorize bugs (CRITICAL, HIGH, MEDIUM, LOW)
- Fix CRITICAL and HIGH bugs immediately
- Defer MEDIUM/LOW bugs to backlog (if not blocking)
Expected Bug Types:
- Integration test failures
- Performance bottlenecks
- Edge case handling (null values, empty lists)
- Error message clarity
Deliverables:
- Bug fix commits
- Updated test suite (all passing)
Week 8: Documentation & Production Readiness
8.1 Architecture Documentation Update (2 days)
Documents to Update:
-
MCP Server Architecture (
docs/architecture/mcp-server-architecture.md)- Add SDK integration section (500+ lines)
- Update component diagrams
- Document hybrid architecture decisions
- Add SDK vs. Custom comparison table
-
SDK Migration Guide (
docs/guides/mcp-sdk-migration.md) - NEW- Step-by-step migration instructions
- Code examples (before/after)
- Common pitfalls and solutions
- Troubleshooting guide
-
ADR: MCP SDK Adoption (
docs/architecture/adr/005-mcp-sdk-adoption.md) - NEW- Decision context
- Options considered
- Decision rationale
- Consequences and trade-offs
Deliverables:
- 3 updated/new documents (1500+ lines total)
- Architecture diagrams (Mermaid or Draw.io)
- Code examples repository
8.2 API Documentation (1 day)
OpenAPI/Swagger Updates:
-
Tool Endpoints
- Document all 10 Tools
- Parameter schemas
- Response examples
- Error codes
-
Resource Endpoints
- Document all 11 Resources
- URI patterns
- Query parameters
- Response formats
-
Authentication
- API Key header format
- Error responses (401, 403)
- Rate limiting headers
Example Swagger Annotation:
[McpTool(Name = "create_issue")]
[SwaggerOperation(
Summary = "Create a new issue",
Description = "Creates Epic/Story/Task with Diff Preview approval workflow"
)]
[SwaggerResponse(200, "Pending change created", typeof(PendingChangeDto))]
[SwaggerResponse(400, "Invalid parameters")]
[SwaggerResponse(401, "Unauthorized")]
public class CreateIssueTool { ... }
Deliverables:
- Complete Swagger/OpenAPI spec
- Interactive API documentation (Swagger UI)
8.3 Code Cleanup (1 day)
Cleanup Tasks:
-
Remove Old Code
- Delete
McpProtocolMiddleware.cs - Delete
ApiKeyAuthMiddleware.cs - Delete
IMcpTool.csinterface - Delete
IMcpResource.csinterface - Remove obsolete NuGet packages
- Delete
-
Update Code Comments
- Add XML documentation to public APIs
- Update inline comments
- Remove TODO/FIXME comments
-
Code Style Enforcement
- Run
dotnet format - Fix StyleCop warnings
- Consistent naming conventions
- Run
-
Dependency Audit
- Remove unused NuGet packages
- Update vulnerable packages
- Lock SDK version (avoid auto-updates)
Deliverables:
- Clean codebase (zero warnings)
- Updated
.csprojfiles - Dependency lock file
8.4 Production Readiness & Deployment (2 days)
Production Readiness Checklist:
-
Testing
- All integration tests pass (>80% coverage)
- Performance benchmarks meet targets
- Security audit passed (0 CRITICAL, 0 HIGH)
-
Documentation
- Architecture docs updated
- API docs complete
- Migration guide published
-
Code Quality
- Code reviewed and approved
- Zero StyleCop warnings
- No TODO/FIXME comments
-
Configuration
- Environment variables documented
- Secrets managed (Azure Key Vault / AWS Secrets Manager)
- Feature flags configured
-
Deployment
- Staging deployment successful
- Smoke tests passed
- Rollback plan documented
Staging Deployment:
- Deploy to staging environment
- Run smoke tests (5 critical scenarios)
- Monitor logs for errors
- Validate performance metrics
Smoke Test Scenarios:
- Claude Desktop can connect (stdio)
- Web client can connect (HTTP/SSE)
- Create issue Tool works
- List projects Resource works
- Diff Preview approval flow works
Rollback Plan:
- Database: No schema changes (safe to rollback)
- Code: Git tag before deployment, revert if needed
- Configuration: Feature flag to disable SDK (fallback to custom)
Deliverables:
- Production readiness report (PASS/FAIL)
- Staging deployment success confirmation
- Rollback plan document
8.5 Final Code Review & Sign-Off (1 day)
Review Checklist:
- Architect review (architecture compliance)
- Tech lead review (code quality)
- Security review (security best practices)
- QA review (test coverage)
- Product manager sign-off (business value delivered)
Sign-Off Criteria:
- All acceptance criteria met (Epic level)
- Performance targets achieved (≥20% improvement)
- Security audit passed (0 CRITICAL, 0 HIGH)
- Documentation complete
- Production deployment plan approved
Deliverables:
- Code review approval
- Sign-off document (all stakeholders)
Acceptance Criteria
Testing
- Integration test suite complete (50+ tests)
- All integration tests pass (100%)
- Performance benchmarks meet targets (≥20% improvement)
- Security audit passed (0 CRITICAL, 0 HIGH)
Documentation
- Architecture docs updated (1500+ lines)
- API docs complete (Swagger)
- Migration guide published
- ADR documented
Code Quality
- Old code removed (330+ lines)
- Zero StyleCop warnings
- XML documentation complete
- Code reviewed and approved
Production Readiness
- Staging deployment successful
- Smoke tests passed
- Rollback plan documented
- All stakeholders signed off
Tasks Breakdown
Week 7: Testing & Optimization
- Task 1 - End-to-end integration testing - 2 days
- Task 2 - Performance testing and optimization - 2 days
- Task 3 - Security audit - 1 day
- Task 4 - Bug fixes and refinement - 1 day
Week 8: Documentation & Deployment
- Task 5 - Architecture documentation update - 2 days
- Task 6 - API documentation (Swagger) - 1 day
- Task 7 - Code cleanup - 1 day
- Task 8 - Production readiness and staging deployment - 2 days
- Task 9 - Final code review and sign-off - 1 day
Progress: 0/9 tasks completed (0%)
Success Metrics
Quality Metrics
- Test Coverage: ≥80%
- Integration Tests: 50+ tests, 100% passing
- Security: 0 CRITICAL, 0 HIGH vulnerabilities
- Code Quality: 0 StyleCop warnings
Performance Metrics
- Tool Execution: ≥20% faster (target: 120ms P95)
- Resource Query: ≥30% faster (target: 85ms P95)
- Throughput: ≥100 req/s (vs. 70 baseline)
- Memory: ≤150 MB (vs. 180 baseline)
Documentation Metrics
- Architecture Docs: 1500+ lines updated
- API Docs: 100% Swagger coverage
- Migration Guide: Complete step-by-step
- Code Examples: 10+ before/after samples
Definition of Done
- All Week 7 tasks complete (testing, optimization, security, bug fixes)
- All Week 8 tasks complete (docs, cleanup, deployment, sign-off)
- Integration tests pass (100%)
- Performance targets met (≥20% improvement)
- Security audit passed (0 CRITICAL, 0 HIGH)
- Documentation complete (architecture, API, migration guide)
- Code cleanup complete (old code removed, warnings fixed)
- Staging deployment successful
- Smoke tests passed
- All stakeholders signed off
Created: 2025-11-09 by Product Manager Agent Owner: Backend Team Lead Start Date: 2026-01-06 (Week 7) Target Date: 2026-01-17 (End of Week 8) Status: Not Started