Files
ColaFlow/docs/plans/sprint_5_story_17.md
Yaojia Wang 34a379750f
Some checks failed
Code Coverage / Generate Coverage Report (push) Has been cancelled
Tests / Run Tests (9.0.x) (push) Has been cancelled
Tests / Docker Build Test (push) Has been cancelled
Tests / Test Summary (push) Has been cancelled
Clean up
2025-11-15 08:58:48 +01:00

439 lines
12 KiB
Markdown

---
story_id: story_17
sprint_id: sprint_5
parent_story_id: story_0
status: not_started
priority: P0
assignee: backend
created_date: 2025-11-09
estimated_days: 10
phase: 5
---
# Story 17: Testing, Optimization & Documentation
**Parent Epic**: [Story 0](sprint_5_story_0.md) - Integrate Microsoft .NET MCP SDK
**Phase**: 5 - Testing & Optimization (Week 7-8)
**Priority**: P0 - Critical
**Estimated Effort**: 10 days (2 weeks)
**Dependencies**: Story 16 (Transport migration complete)
## User Story
**As** a backend team lead,
**I want** comprehensive testing, performance optimization, and documentation for MCP SDK integration,
**So that** we have production-ready code with zero regressions and complete knowledge transfer.
## Business Value
- **Quality Assurance**: Zero CRITICAL bugs in production
- **Performance Validation**: Confirm ≥20% improvement target met
- **Security Confidence**: Pass security audit with zero HIGH vulnerabilities
- **Team Knowledge**: Complete documentation for future maintenance
- **Production Ready**: Confident deployment with rollback plan
## Week 7: Integration Testing & Bug Fixes
### 7.1 End-to-End Integration Testing (2 days)
**Test Scenarios**:
1. **Claude Desktop Integration** (stdio)
- Initialize handshake
- List Tools and Resources
- Call each Tool (10 total)
- Query each Resource (11 total)
- Verify Diff Preview workflow
- Test approval/rejection flow
2. **Web Client Integration** (HTTP/SSE)
- HTTP POST requests to MCP endpoints
- SSE connection for notifications
- API Key authentication
- CORS preflight handling
3. **Multi-Tenant Isolation**
- Create 2 test tenants
- Verify cross-tenant data access blocked
- Test API Keys scoped to tenants
- Validate Global Query Filters
4. **Error Handling**
- Invalid API Key
- Missing required parameters
- Malformed JSON-RPC requests
- Network failures (timeout, disconnect)
**Deliverables**:
- Integration test suite (50+ test cases)
- Test execution report
- Bug tracking spreadsheet
---
### 7.2 Performance Testing & Optimization (2 days)
**Baseline vs. Target Performance**:
| Metric | Baseline (Custom) | Target (SDK) | Actual (Measured) |
|--------|-------------------|--------------|-------------------|
| Tool Execution (P95) | 150ms | 120ms (20% faster) | TBD |
| Resource Query (P95) | 120ms | 85ms (30% faster) | TBD |
| Throughput | 70 req/s | 100 req/s | TBD |
| Memory Usage | 180 MB | 150 MB (15% less) | TBD |
**Performance Tests**:
1. **Load Testing** (Apache Bench or k6)
- 100 concurrent users
- 1000 requests total
- Measure P50, P95, P99 latency
2. **Memory Profiling** (dotMemory)
- Baseline memory usage
- Peak memory under load
- Memory leak detection
3. **Database Query Performance**
- EF Core query analysis
- Index usage verification
- N+1 query detection
**Optimization Tasks** (if needed):
- Add missing database indexes
- Optimize Redis cache keys
- Tune connection pool sizes
- Enable HTTP response compression
**Deliverables**:
- Performance benchmark report
- Optimization recommendations
- Before/after comparison charts
---
### 7.3 Security Audit (1 day)
**Security Tests**:
1. **Authentication & Authorization**
- API Key brute force attempt (rate limiting)
- Expired API Key handling
- Invalid API Key handling
- Field-level permission bypass attempts
2. **Multi-Tenant Security**
- Cross-tenant data access attempts
- SQL injection attempts (parameterized queries)
- JSONB injection attempts
- Path traversal attempts (Resource URIs)
3. **Input Validation**
- Tool parameter validation
- Resource URI validation
- JSON-RPC message validation
- CSRF protection (HTTP transport)
4. **Sensitive Data Exposure**
- Log scrubbing (no API Keys, passwords logged)
- Error messages (no stack traces to clients)
- HTTPS enforcement (production)
**Security Checklist**:
- [ ] OWASP Top 10 compliance
- [ ] API Key BCrypt hashed (never plaintext)
- [ ] HTTPS only (production)
- [ ] Rate limiting enabled
- [ ] CORS properly configured
- [ ] SQL injection protected (EF Core parameterized)
- [ ] XSS protection (JSON escaping)
- [ ] Sensitive data not logged
**Deliverables**:
- Security audit report (PASS/FAIL per category)
- Vulnerability remediation plan (if issues found)
---
### 7.4 Bug Fixes & Refinement (1 day)
**Bug Triage Process**:
1. Categorize bugs (CRITICAL, HIGH, MEDIUM, LOW)
2. Fix CRITICAL and HIGH bugs immediately
3. Defer MEDIUM/LOW bugs to backlog (if not blocking)
**Expected Bug Types**:
- Integration test failures
- Performance bottlenecks
- Edge case handling (null values, empty lists)
- Error message clarity
**Deliverables**:
- Bug fix commits
- Updated test suite (all passing)
---
## Week 8: Documentation & Production Readiness
### 8.1 Architecture Documentation Update (2 days)
**Documents to Update**:
1. **MCP Server Architecture** (`docs/architecture/mcp-server-architecture.md`)
- Add SDK integration section (500+ lines)
- Update component diagrams
- Document hybrid architecture decisions
- Add SDK vs. Custom comparison table
2. **SDK Migration Guide** (`docs/guides/mcp-sdk-migration.md`) - NEW
- Step-by-step migration instructions
- Code examples (before/after)
- Common pitfalls and solutions
- Troubleshooting guide
3. **ADR: MCP SDK Adoption** (`docs/architecture/adr/005-mcp-sdk-adoption.md`) - NEW
- Decision context
- Options considered
- Decision rationale
- Consequences and trade-offs
**Deliverables**:
- 3 updated/new documents (1500+ lines total)
- Architecture diagrams (Mermaid or Draw.io)
- Code examples repository
---
### 8.2 API Documentation (1 day)
**OpenAPI/Swagger Updates**:
1. **Tool Endpoints**
- Document all 10 Tools
- Parameter schemas
- Response examples
- Error codes
2. **Resource Endpoints**
- Document all 11 Resources
- URI patterns
- Query parameters
- Response formats
3. **Authentication**
- API Key header format
- Error responses (401, 403)
- Rate limiting headers
**Example Swagger Annotation**:
```csharp
[McpTool(Name = "create_issue")]
[SwaggerOperation(
Summary = "Create a new issue",
Description = "Creates Epic/Story/Task with Diff Preview approval workflow"
)]
[SwaggerResponse(200, "Pending change created", typeof(PendingChangeDto))]
[SwaggerResponse(400, "Invalid parameters")]
[SwaggerResponse(401, "Unauthorized")]
public class CreateIssueTool { ... }
```
**Deliverables**:
- Complete Swagger/OpenAPI spec
- Interactive API documentation (Swagger UI)
---
### 8.3 Code Cleanup (1 day)
**Cleanup Tasks**:
1. **Remove Old Code**
- Delete `McpProtocolMiddleware.cs`
- Delete `ApiKeyAuthMiddleware.cs`
- Delete `IMcpTool.cs` interface
- Delete `IMcpResource.cs` interface
- Remove obsolete NuGet packages
2. **Update Code Comments**
- Add XML documentation to public APIs
- Update inline comments
- Remove TODO/FIXME comments
3. **Code Style Enforcement**
- Run `dotnet format`
- Fix StyleCop warnings
- Consistent naming conventions
4. **Dependency Audit**
- Remove unused NuGet packages
- Update vulnerable packages
- Lock SDK version (avoid auto-updates)
**Deliverables**:
- Clean codebase (zero warnings)
- Updated `.csproj` files
- Dependency lock file
---
### 8.4 Production Readiness & Deployment (2 days)
**Production Readiness Checklist**:
- [ ] **Testing**
- [ ] All integration tests pass (>80% coverage)
- [ ] Performance benchmarks meet targets
- [ ] Security audit passed (0 CRITICAL, 0 HIGH)
- [ ] **Documentation**
- [ ] Architecture docs updated
- [ ] API docs complete
- [ ] Migration guide published
- [ ] **Code Quality**
- [ ] Code reviewed and approved
- [ ] Zero StyleCop warnings
- [ ] No TODO/FIXME comments
- [ ] **Configuration**
- [ ] Environment variables documented
- [ ] Secrets managed (Azure Key Vault / AWS Secrets Manager)
- [ ] Feature flags configured
- [ ] **Deployment**
- [ ] Staging deployment successful
- [ ] Smoke tests passed
- [ ] Rollback plan documented
**Staging Deployment**:
1. Deploy to staging environment
2. Run smoke tests (5 critical scenarios)
3. Monitor logs for errors
4. Validate performance metrics
**Smoke Test Scenarios**:
- Claude Desktop can connect (stdio)
- Web client can connect (HTTP/SSE)
- Create issue Tool works
- List projects Resource works
- Diff Preview approval flow works
**Rollback Plan**:
- Database: No schema changes (safe to rollback)
- Code: Git tag before deployment, revert if needed
- Configuration: Feature flag to disable SDK (fallback to custom)
**Deliverables**:
- Production readiness report (PASS/FAIL)
- Staging deployment success confirmation
- Rollback plan document
---
### 8.5 Final Code Review & Sign-Off (1 day)
**Review Checklist**:
- [ ] Architect review (architecture compliance)
- [ ] Tech lead review (code quality)
- [ ] Security review (security best practices)
- [ ] QA review (test coverage)
- [ ] Product manager sign-off (business value delivered)
**Sign-Off Criteria**:
- All acceptance criteria met (Epic level)
- Performance targets achieved (≥20% improvement)
- Security audit passed (0 CRITICAL, 0 HIGH)
- Documentation complete
- Production deployment plan approved
**Deliverables**:
- Code review approval
- Sign-off document (all stakeholders)
---
## Acceptance Criteria
### Testing
- [ ] Integration test suite complete (50+ tests)
- [ ] All integration tests pass (100%)
- [ ] Performance benchmarks meet targets (≥20% improvement)
- [ ] Security audit passed (0 CRITICAL, 0 HIGH)
### Documentation
- [ ] Architecture docs updated (1500+ lines)
- [ ] API docs complete (Swagger)
- [ ] Migration guide published
- [ ] ADR documented
### Code Quality
- [ ] Old code removed (330+ lines)
- [ ] Zero StyleCop warnings
- [ ] XML documentation complete
- [ ] Code reviewed and approved
### Production Readiness
- [ ] Staging deployment successful
- [ ] Smoke tests passed
- [ ] Rollback plan documented
- [ ] All stakeholders signed off
## Tasks Breakdown
### Week 7: Testing & Optimization
- [ ] [Task 1](sprint_5_story_17_task_1.md) - End-to-end integration testing - 2 days
- [ ] [Task 2](sprint_5_story_17_task_2.md) - Performance testing and optimization - 2 days
- [ ] [Task 3](sprint_5_story_17_task_3.md) - Security audit - 1 day
- [ ] [Task 4](sprint_5_story_17_task_4.md) - Bug fixes and refinement - 1 day
### Week 8: Documentation & Deployment
- [ ] [Task 5](sprint_5_story_17_task_5.md) - Architecture documentation update - 2 days
- [ ] [Task 6](sprint_5_story_17_task_6.md) - API documentation (Swagger) - 1 day
- [ ] [Task 7](sprint_5_story_17_task_7.md) - Code cleanup - 1 day
- [ ] [Task 8](sprint_5_story_17_task_8.md) - Production readiness and staging deployment - 2 days
- [ ] [Task 9](sprint_5_story_17_task_9.md) - Final code review and sign-off - 1 day
**Progress**: 0/9 tasks completed (0%)
## Success Metrics
### Quality Metrics
- **Test Coverage**: ≥80%
- **Integration Tests**: 50+ tests, 100% passing
- **Security**: 0 CRITICAL, 0 HIGH vulnerabilities
- **Code Quality**: 0 StyleCop warnings
### Performance Metrics
- **Tool Execution**: ≥20% faster (target: 120ms P95)
- **Resource Query**: ≥30% faster (target: 85ms P95)
- **Throughput**: ≥100 req/s (vs. 70 baseline)
- **Memory**: ≤150 MB (vs. 180 baseline)
### Documentation Metrics
- **Architecture Docs**: 1500+ lines updated
- **API Docs**: 100% Swagger coverage
- **Migration Guide**: Complete step-by-step
- **Code Examples**: 10+ before/after samples
## Definition of Done
- [ ] All Week 7 tasks complete (testing, optimization, security, bug fixes)
- [ ] All Week 8 tasks complete (docs, cleanup, deployment, sign-off)
- [ ] Integration tests pass (100%)
- [ ] Performance targets met (≥20% improvement)
- [ ] Security audit passed (0 CRITICAL, 0 HIGH)
- [ ] Documentation complete (architecture, API, migration guide)
- [ ] Code cleanup complete (old code removed, warnings fixed)
- [ ] Staging deployment successful
- [ ] Smoke tests passed
- [ ] All stakeholders signed off
---
**Created**: 2025-11-09 by Product Manager Agent
**Owner**: Backend Team Lead
**Start Date**: 2026-01-06 (Week 7)
**Target Date**: 2026-01-17 (End of Week 8)
**Status**: Not Started